For new service (new construction) requests, you need to complete the electric and natural gas service application. For electric service members, please refer to our Electric Service Manual for electric service requirements and guidelines.

    For all new electric service requests - at a location where there has never been a service - you will need the following information (download our helpful Electric New Service Construction Checklist).

    • Account name
    • Billing address
    • Home phone
    • Work phone
    • Cell phone
    • Electrician name and telephone number
    • 911 address of new service including city
    • Lot number if in a subdivision or legal description if not in a subdivision or on a city lot
    • Subdivision name
    • Service size
    • Construction start date

    JCE Co-op approved meter socket must be installed prior to construction of service. The meter socket must be installed and wired to the National Electric Code. Select the button for the JCE Wiring Statement/Certificate of Electric Inspection form.

    Please return to JCE Co-op, ATTN: Ops Department, PO Box 390, Elizabeth, IL 61028

    Line Extension Costs

    $600 System Access Fee, plus:


    $7/foot - 0-500'

    $6/foot - 501-1000'

    $5/foot - >1000'


    • Line extension fees the same-overhead or underground
    • If underground, the member is responsible for conduits, trenching and other installation costs
    • Additional fee for winter construction
       

    Payment Options

    • Full payment prior to construction
    • Visa, MasterCard, Discover, check or e-check
    • Construction loan verification from lender is required when payment is made from the construction loan
       

    Easements

    • Easements may be required-whether in a subdivision or not
    • Must be signed and dated by member/property owner in presence of Notary Public
    • New easement will be prepared by JCE Co-op
    • Must be completed and returned before construction
    • The original will be sent to the respective courthouse for recording
       

    Member Responsibilities

    • Line extension payment
    • Trench and/or directional bore
    • Conduits. JCE Co-op may provide conduit at an additional cost
    • Right-of-way clearing
    • Backfilling and restoration
    • Road crossings
    • Installation of JCE Co-op approved meter socket.
    • Legal description of property if easement is needed
    • Membership application